Project Details

88 St Leonards

  • Client
    Fast Form
  • Builder
    JQZ
  • Architect
    PTW Architects
  • Our Role
    Consultancy, manufacturing and supplying
  • Products
    Raking, Tree, Diamon and Round Columns

Project Summery

Eighty Eight is one of Sydney’s most innovative new urban projects creating a vibrant mixed use neighbourhood and revitalised St Leonards. The project deliver new much needed high quality large floor plate commercial office space and residential uses. Located in the heart of St Leonards’ commercial district, the project defines the eastern edge of a future civic plaza and a series of pedestrian-activated laneways. Eighty-Eight sets a new benchmark in integrated living, working, shopping, office space and transport infrastructure set to be rolled out across Sydney.

The focal point in St Leonards’ monumental urban transformation, Eighty Eight By JQZ places residents front and centre to transport, leisure and absolute luxury. Whilst breathtaking Harbour and City Skyline views take centre stage in the apartments.

7
IMG_8816

Challenge & Solution

Our service includes providing a formwork solution for the iconic podium column design in Civic Plaza. The original design featured diamond-shaped V-Columns extended to a height of 7 meters to support the cantilever floor above, creating a visually striking architectural feature. However, after carefully analyzing the V column, our team at Consystex suggested a design revision to enhance construction efficiency and reduce costs for a total of 27 columns were required to support the podium. 

Drawing upon our expertise, we developed an innovative combination solution using our Box system for the plinth and an inclined diamond-shaped column constructed with our signature Pink Tube. This unique approach allowed us to achieve the desired architectural vision while optimizing the construction process. By implementing our revised design and leveraging the efficiency of the Box system for the plinth and the Pink Tube for the inclined diamond columns, we successfully streamlined the construction process and achieved significant cost savings.

10